How To Use A Diamond Wire Saw?
ONE. Requirements for the working environment before the product is used 1. Power requirements: provide a three-phase power supply of 380±10%V, and provide enough length according to the actual situation of the sitedegree of cable.Cable specifications: (1) 22kw, 30kw: YC3×16+1×10; (2) 37, 45kw: YC3×25+1×10; (3) 55, 75kw: YC3×35+1×16.2. Ensure that sufficient cooling water is supplied, …